Rooftop Solar System — 85.14 kW
85.14 kW DC rooftop SolarEdge PV system spanning Buildings 1 & 2 — engineered by Green Cal, Inc. (Solar Aurora design 2026-06-13). PV equipment only; electrical infrastructure is broken out as separate line items.
- Offsets the vast majority of campus daytime load
- Locks in a known energy cost for 25 years
- Fully Direct Pay eligible — 30–50% federal cash refund
- SolarEdge module-level optimization preserves output under partial shading
- Roof-mounted modules with SolarEdge optimizers across both buildings.
- String inverter(s) wall-mounted at the main service.
- Production monitoring portal handed to the campus on PTO.